- Nov 17 '19 por>eng Ponto de situação current state of affairs pro closed no
- Oct 16 '17 por>eng “punção” das palhetas stamping the vanes pro closed no
- Jul 3 '15 por>eng Parque de Iluminação Pública public lighting infrastructure pro closed ok
- Jun 24 '15 por>eng Mandril de corrente Pig pro closed no
- Apr 17 '15 por>eng em chapa de aço monobloco solid steel sheet pro closed ok
- Jan 23 '15 por>eng grandezas pertinentes and relevant values pro closed ok
2 Jan 3 '15 por>eng valorização valorisation parameters pro closed ok
4 Nov 1 '14 por>eng cota de retenção/cota do leito normal retention level/river bed level pro closed ok
- Jul 5 '14 por>eng munhões gate valves pro closed no
- May 28 '14 por>eng energia móvel kinetic power pro closed no
- Oct 11 '13 por>eng reconectadores switchgear pro closed ok
- Jul 14 '13 por>eng carenagens cowlings pro closed no
- Jul 13 '13 por>eng períodos intercalados favoráveis de chuvas interspersed with favourable periods of rainfall pro closed ok
- Apr 21 '13 por>eng com sede para guarnição seat/seating for (the) trim pro closed ok
4 Mar 7 '13 por>eng sobrematerial excess material pro closed ok
- Mar 7 '13 por>eng cota de partida starting level pro closed ok
- Dec 13 '12 por>eng Guarnição para pólo pole/post trim pro closed ok
4 Dec 9 '12 por>eng lançamentos de cabos para raios de aço galvanizado laying/installing galvanised steel lightning conductor cables pro closed ok
4 Nov 7 '12 por>eng amarração e nivelamento setting out/staking and leveling pro closed ok
- May 5 '12 por>eng vigas de calagem counter-balance tuning? pro open no
4 May 5 '12 por>eng velocidade de embalamento over-running, excessive speed, run away speed pro closed ok
- Feb 1 '12 por>eng turbinas dos cataventos eolic turbines/generators pro closed no
- Nov 26 '11 por>eng Energia de Reserva stand-by power pro closed no
- Nov 19 '11 por>eng estanqueidade and the "state" of the electric system pro closed ok
- Nov 5 '11 por>eng posto tarifário tariff rate pro closed ok
- Oct 21 '11 por>eng residencial bifásico residential two phase supply pro closed ok
4 Aug 18 '11 por>eng curva conjugado velocidade the curve (on the graph) combines speed/velocity with the effect of inertia pro closed no
- Aug 4 '11 por>eng Sublastro track bed or ballast (top ballast is laid over this) pro closed ok
- Aug 4 '11 por>eng Sarjeta de corte drainage channel, gutter, pro just_closed ok
- Aug 2 '11 por>eng Muro de Fechamento locks pro closed ok
- Jul 14 '11 por>eng reservação (reserve) capacity of ......M3 pro closed ok
- Apr 29 '11 por>eng TP - Transformador de Tensão transformer pro closed ok
- Apr 29 '11 por>eng Redes Inteligentes de Energia (Smart Grid) Smart Grid pro closed ok
- Apr 29 '11 por>eng Estrutura Tarifária billing method pro closed ok
- Mar 20 '11 por>eng cota distance pro closed ok
4 Mar 19 '11 por>eng parafuso de cabeça limão com fenda round head slotted screw pro closed ok
- Mar 19 '11 por>eng caixa de proteção e conexão (electrical) mains breaker box pro closed ok